The MLC will be carrying out extensive refurbishment of the downstream lock entrance moorings.
Work will commence on 7th March 2023. As there will be no place to moor up a boat at this end of the lock, during this time a temporary lock keeper will be on hand each day to assist from 8am to 4pm, until the moorings are reopened.